Abstract

Indigenous construction firms are critical to Nigeria’s economic development, job creation and infrastructure delivery, yet they remain less competitive than foreign counterparts. This paper assesses the major challenges confronting indigenous construction firms in Nigeria. Using a review of empirical and conceptual literature, the study identifies key constraints relating to finance, procurement practices, capacity and technology, regulatory and institutional frameworks, corruption, project management practices, and macroeconomic instability. The findings show that limited access to credit, delayed payments, biased procurement processes, inadequate technical and managerial capacity, low technology adoption, weak enforcement of regulations, and high levels of corruption significantly undermine the performance and growth of indigenous firms. The paper concludes that a comprehensive strategy is needed, involving policy reforms, targeted financial support, capacity-building programmes, and improved governance of procurement and contract administration. Recommendations include improving access to long-term finance, promoting fair competition in public procurement, strengthening professional and technical capacity, incentivizing innovation and technology adoption, and enforcing stricter regulatory oversight to reduce corruption and project delivery risks.

Downloads

Download data is not yet available.

References

A. A. Aibinu and G. O. Jagboro, “The effects of construction delays on project delivery in Nigerian construction industry,” International Journal of Project Management, vol. 20, no. 8, pp. 593–599, 2002.

M. O. Dada and G. O. Jagboro, “Core skills required of project managers in the Nigerian construction industry,” International Journal of Project Management, vol. 30, no. 3, pp. 258–264, 2012.

O. J. Ameh and E. E. Osegbo, “Study of relationship between time overrun and productivity on construction sites,” International Journal of Construction Supply Chain Management, vol. 1, no. 1, pp. 56–67, 2011.

K. T. Odusami and A. A. Oladapo, “Project planning and control practice of indigenous and expatriate contractors in Nigeria,” Journal of Construction, vol. 1, no. 2, pp. 1–12, 2008.

G. I. Idoro, “Influence of quality performance on clients’ patronage of indigenous and expatriate construction contractors in Nigeria,” Journal of Civil Engineering and Management, vol. 16, no. 1, pp. 65–73, 2010.

B. A. Kolo and A. D. Ibrahim, “Technology adoption in Nigeria’s construction industry: A focus on indigenous contractors,” Journal of Engineering, Design and Technology, vol. 19, no. 5, pp. 1–18, 2021.

G. I. Idoro, “The influence of project documents on the outcome of construction projects procured by design–build in Nigeria,” Journal of Construction in Developing Countries, vol. 17, no. 2, pp. 1–19, 2012.

C. Amadi, O. Duru, and A. Ogbonna, “Evaluation of public procurement procedures on project delivery in Nigeria,” Journal of Construction Business and Management, vol. 2, no. 2, pp. 11–21, 2018.

A. Afolabi, O. Fagbenle, and T. Mosaku, “Barriers and prospects of construction SMEs in Nigeria,” Journal of Construction in Developing Countries, vol. 23, no. 2, pp. 1–18, 2018.

S. Plattard, “Security in space: Should space traffic management also concern payloads management?,” Space Policy, vol. 33, pp. 56–62, Aug. 2015, doi: 10.1016/j.spacepol.2015.02.005.

H. Barnard, T. Bromfield, and J. Cantwell, “The Role of Indigenous Firms in Innovation Systems in Developing Countries: The Developmental Implications of National Champion Firms’ Response to Underdeveloped National Innovation Systems,” in Handbook of Innovation Systems and Developing Countries, Edward Elgar Publishing, 2009. doi: 10.4337/9781849803427.00017.

V. Poltoratskaia and M. Fazekas, “Data Analytics for Anti-Corruption in Public Procurement,” in Routledge Handbook of Public Procurement Corruption, Routledge, 2024, pp. 42–59. doi: 10.4324/9781003220374-6.

A. Hadjimanolis, “A Resource-based View of Innovativeness in Small Firms,” Technology Analysis & Strategic Management, vol. 12, no. 2, pp. 263–281, Jun. 2000, doi: 10.1080/713698465.

T. J. Lebakeng, “Political Polarisation, Compromised Procurement and Poor Service Delivery in the Kingdom of Lesotho,” in Public Procurement, Corruption and the Crisis of Governance in Africa, Springer International Publishing, 2021, pp. 205–222. doi: 10.1007/978-3-030-63857-3_11.

C. P. Ogbu, “Survival practices of indigenous construction firms in Nigeria,” International Journal of Construction Management, vol. 18, no. 1, pp. 78–91, Jan. 2017, doi: 10.1080/15623599.2016.1277056.

Downloads

Published

2026-01-31

How to Cite

Okereke, R. A. ., & Emmanuel, N. (2026). Assessment of Challenges Faced by Indigenous Construction Firms in Nigeria. Central Asian Journal of Theoretical and Applied Science, 7(1), 285–292. https://doi.org/10.51699/cajotas.v7i1.1656

Issue

Section

Articles